Risk Management
Bring risk assessments, controls, treatment decisions, and residual risk together in one connected record.
Connect Risk Assessments, Controls, and Treatment
coming soon
Trackmedium eQMS helps teams manage risk from the first assessment through treatment and ongoing review. Keep each Risk Item connected to its assessment history, record the controls relied upon, and evaluate the risk that remains after treatment. A shared Control Library supports reuse across assessments, while revision traceability preserves the basis of every completed risk decision.
Risk Register and Assessment History
Keep each Risk Item as the ongoing record of the risk and connect it to the assessments performed over time. View the current accepted risk position alongside the history behind it, so teams can understand how the risk and its controls have changed.
Initial and Residual Risk Assessments
Evaluate probability and severity in the context of the controls currently in place. After treatment, assess the complete control environment again and record the residual risk. Keep the initial and post-treatment assessments distinct so the effect of each decision can be reviewed.
Reusable Control Library
Maintain a shared library of controls and use the relevant active controls in an assessment. Record which control revision was assessed, its effectiveness for that risk, and the assessment comments. Reuse the control definition while retaining the context of each risk assessment.
Treatment That Reflects Real Changes
Record the control changes needed to treat a risk: create a new control, add a control from the library, strengthen a current control, or remove or replace it. Keep the original control set intact as the historical basis of the initial assessment.
Current Controls at a Glance
Show the controls relied upon by the latest completed assessment on the Risk Item. Include implemented treatment changes and exclude proposals that were never implemented. Display the assessed revision alongside the current active revision so differences are visible.
Revision Traceability and Reassessment
Preserve the exact control revisions used in completed assessments and treatment history. When a control changes, compare the newer active revision with the version previously assessed and decide whether reassessment is needed. Keep earlier decisions traceable as the control environment evolves.
Quality and Safety in One Platform
Nordic Ware brought its quality and safety processes together in Trackmedium.
"We've replaced multiple disconnected tools and processes with one platform - saving time and costs."
Quality Assurance & Continuous Improvement Manager, Nordic Ware
Connected Platform
Bring risk discussions into your wider quality and safety processes. Explore related modules for controlled documents, task-level safety, and food safety planning.
Risk Management Lifecycle at a Glance
From identifying a risk to reviewing its residual level, keep the assessment, treatment changes, and control history connected. Each completed assessment preserves the control revisions that supported the decision.
Identify the Risk Create the Risk Item and define the context of the risk to be assessed.
Assess the Current Risk Evaluate probability, severity, and the controls already in place.
Plan the Treatment Define the controls to add, strengthen, remove, or replace.
Implement Control Changes Record the changes carried out and the controls now relied upon.
Assess Residual Risk Reassess the risk against the complete post-treatment control environment.
Review and Reassess Keep the current risk position visible and reassess when circumstances change.
Built for Quality, Safety, and Operational Teams
Trackmedium's eQMS Risk Management module gives teams a consistent way to assess risk, review controls, and preserve the decisions behind the current risk position.
Risk Across Your Operations
Connect risk records, assessment history, control effectiveness, and treatment decisions in one quality platform.
- Quality and Product Risk
- Health and Safety Risk
- Process and Operational Risk
- Supplier and Supply Chain Risk
- Cross-Functional Reviews
Assessments Through the Risk Lifecycle
Keep the initial assessment, treatment changes, and residual assessment connected as the control environment evolves.
- Initial Assessments
- Treatment Planning
- Residual Assessments
- Control Changes
- Ongoing Reassessment
Why Trackmedium eQMS?
Make Risk Decisions Easier to Review
Bring assessments, controls, treatment changes, and residual risk into one coherent history. Give reviewers the context behind the current risk position and the decisions that led to it.
Reuse Controls with Clear Context
Use a shared Control Library while recording how each control is relied upon for a particular risk. Keep the distinction between a library definition and the control environment assessed by the team.
Preserve the Basis of Every Assessment
Retain the exact control revisions used at the time of assessment. Keep completed decisions and treatment history traceable as controls change and new assessments are performed.
Frequently Asked Questions
How do Risk Items differ from Risk Assessments?
A Risk Item is the ongoing record of a risk. A Risk Assessment records the evaluation and decisions made at a particular point in time. Connecting the two gives the team a current view of the risk while preserving earlier assessment results and control history.
What is the Control Library?
The Control Library holds reusable control records. An assessment selects the controls relevant to its context and records the specific revision, effectiveness, and assessment comments. The same control can be used in more than one risk context without losing the history of each assessment.
What does Add Control from Library mean?
It means selecting an active control from the overall Control Library and introducing it into the post-treatment control environment. It is different from modifying a current control that was already included in the initial assessment.
Can treatment remove or replace a current control?
Yes. Treatment can remove a control from the controls relied upon for that risk or replace it with a new or library control. The original assessment retains its historical control set. Removing a control from one risk does not retire the control record for every other risk that uses it.
How is residual risk assessed?
After treatment, the assessor evaluates the complete post-treatment control environment and reassesses probability and severity. Adding, changing, or removing a control does not automatically prove that risk has decreased; the residual assessment records the actual evaluation.
Which controls appear on the Risk Item?
Current Controls reflects the controls relied upon by the latest completed assessment, including implemented treatment changes. Proposed controls that were not implemented are excluded. The assessed revision and the current active revision can be viewed separately.
What happens when a control is revised?
A completed assessment continues to reference the exact revision used when that assessment was made. A newer active revision does not silently replace it. The team can compare the revisions and decide whether the change requires a new assessment.
Can we see how a risk has changed over time?
Yes. Assessment and treatment history preserve the earlier control sets, their revisions, and the decisions made at each stage. The Risk Item provides the current accepted position while completed assessments retain the historical basis for comparison and review.
See more questions
Ready to Bring Risk and Controls Together?
Connect risk assessments, treatment decisions, and control history.
Connect risk assessments, treatment decisions, and control history.
